Morek DC 120-180kw rapid charging

Smart and reliable EV chargers for homes and businesses

Power your EV with compact, efficient and future-ready AC and DC chargers. Designed for fast installation, stable everyday use, and seamless connectivity — from private garages to commercial sites.

Built for European conditions and real users in mind. Supported by genuine technical expertise.

Charge smarter with Morek.

DC 60 concrete foundation base and top plate
Morek Accessories

DC 60 concrete foundation base and top plate

Morek EV Charging Accessories

The Morek DC 60 Concrete Foundation is a purpose-designed concrete base engineered for the secure installation of Morek DC 60 kW charging stations. It ensures long-term stability, precise alignment, and compatibility with DC charger stands, providing a reliable foundation for permanent outdoor charging installations. work.

Product ID: MEVA60DCNFUND

Key features:

  • Concrete foundation base with top plate for Morek DC 60 kW chargers
  • Designed for stable and secure outdoor installation
  • Ensures correct positioning and long-term structural support
  • Compatible with Morek DC charger stands
  • Engineered for streamlined installation and reduced on-site preparation
  • Suitable for commercial and semi-public charging locations

Why Choose Morek EVC

✓ Easy Installation (Plug-and-Play)

Supports both single-phase and three-phase setups. Compact enclosure suitable for wall or pedestal mounting.

✓ Secure Access with RFID

Ideal for offices, apartment buildings, rental properties, and commercial parking areas.

✓ Smart Connectivity (App / WiFi / Ethernet / OCPP 1.6)

Monitor energy usage, set schedules, limit power, or integrate the charger into ANY OCPP-based management platform.

✓ Robust Safety & Durability

Built-in RCD functionality, over-voltage and over-temperature protection, and weatherproof design for long outdoor lifetime.

✓ Excellent Price-to-Performance Ratio

A professional-grade AC charger that remains affordable without compromising stability or long-term reliability.

  • Does the Morek AC charger work with all EVs?

    Yes — it is compatible with all European EVs using the Type 2 standard.

  • Does it support 3-phase charging?

    Yes — 11 kW and 22 kW models require a 3-phase power supply.

  • Can it integrate with charging management software?

    Yes — OCPP 1.6 support ensures interoperability with most European platforms.

  • Does the MEV charger support Dynamic Load Management (DLM)?

    Yes. The MEV charger supports basic Dynamic Load Management using a single external CT clamp connected to the main phase.

    This ensures the charger automatically adjusts its charging power so the building’s main fuse is not overloaded.

Creating a better future for You

We, at Morek, strongly believe in creating a positive change in the electrical industry, helping our customers efficiently solve their issues, big and small, saving your money and time, and creating a better future for you.

Get in touch

We offer fast delivery, competitive pricing, and expert technical support and consultation. Morek provides comprehensive products with solutions that ensure smooth installation and convenient usage.

Contact us to become our partner and enjoy all the benefits we offer.

Export sales and Country manager, Czech
Jan Vejvoda EVC Export Sales Manager jan.vejvoda@morek.cz +420 727835176
This field is for validation purposes and should be left unchanged.